Real ranges, no bait pricing. Three questions below give you a ballpark. Your fixed number comes from the free inspection and a written quote.
Honest 2026 ranges. No from-99-dollar bait. The price moves with roof size, pitch, access, material and any structural work underneath.
Standard roof, tile-to-Colorbond or tile-for-tile. Roof area, pitch and hips move the number.
Bigger roof area, more hips and valleys, insulation upgrade included where it makes sense.
Full scaffold, premium terracotta, heritage detailing. More access equipment, more time.
A cheap quote usually means one of these is being skimped. And it's never the one you can see.
Six things decide your final number. Know them before you compare quotes.
More square metres and a steeper pitch mean more material and slower, safer work.
Two storeys, tight sites and scaffold all add time and safety gear to the job.
Asbestos adds licensed removal. Old iron may hide rot underneath that only shows once stripped.
Colorbond steel vs tile-for-tile change the rate per square metre and the install time.
Rotted battens or sagging rafters are quoted separately with photographic proof before you approve.
Insulation upgrades, sarking, extra vents and site clean-up all move the final number.
Why steel beats tile for most Adelaide homes. Tile-to-metal conversions explained.
Read the guide →How licensed asbestos removal works, what it costs, and the clearance certificate.
Asbestos guide →The five steps from phone call to a finished, warranted roof. See the full timeline.
See the process →Real Adelaide re-roofs with before and after photos, prices and timelines.
View projects →Metro Adelaide plus a 150 km radius. See if we cover your suburb.
Check your area →Free inspection, written fixed quote within 48 hours. No pressure, ever.
Book now →Yes. In writing. The only legitimate variable is unforeseen structural work, which we quote separately with photographic evidence before proceeding. Weather delays affect timing, not price.
Standard terms are a small deposit to book materials, with the balance on completion. You never pay the full amount before the roof is finished.
All our quotes are GST-inclusive. The number you sign is the number you pay.
A standard single-storey home is 3 to 7 working days, weather permitting. We strip, replace battens where needed, install sarking and the new roof, then clean the site daily.
Enter your phone. We'll call with the next step. No obligation.