A mossy 1974 concrete tile roof that leaked every winter. Stripped, re-battened and re-sheeted in Surfmist Colorbond in 6 days.
Before
AfterThe owner had paid for ridge cap re-pointing twice in five years. Every winter a new leak appeared in a different room. The tiles were cracked in dozens of places, the pointing was crumbling, and the sarking had failed years earlier. Patching was no longer a repair: it was a subscription.
Old tiles removed, sorted and recycled. Battens inspected: 30% were rotted and replaced. All photographed and shown to the owner before any extra work was quoted.
New treated battens where needed, then a modern reflective sarking blanket installed across the full roof.
Surfmist Colorbond sheets laid and screwed off, new flashings, valleys and ridge capping.
50mm insulation blanket laid under the steel, ridge capping fixed, every screw point checked, edges sealed.
Site cleaned daily, all waste removed, final walkthrough with the owner and a written 10-year workmanship warranty plus BlueScope's 25-year steel warranty.
«Fixed price, exactly as quoted. Site was cleaner when they left than when they arrived.»
Margaret T., Torrens Park · verified projectEnter your phone. We'll call with the next step. No obligation.