Free inspection· Fixed quote in 48h· $0 call-out· Mon–Sat 7am–5pm hello@reroofadelaide.com.au

BAL-Rated Roof Replacement Mount Barker

A hills home in a mapped bushfire zone. BAL-compliant Colorbond with full sarking and ember guards, documented for the insurer, in 6 days.

Old tile roof before BAL upgrade, Mount BarkerBefore
New BAL-rated Colorbond roof, Mount BarkerAfter

The brief

The owners' insurer asked for evidence their roof met the bushfire construction standard. The old roof did not. We installed a BAL-rated non-combustible roof: full sarking, ember guards on every vent, and the documentation to hand to the insurer.

What we did, step by step

01
Before

BAL assessment

The property checked against the bushfire attack level map. BAL-29 requirements confirmed before quoting.

02
Days 1-2

Strip and prepare

Old tiles removed. The frame checked and battens replaced where needed, then full sarking installed.

03
Days 3-6

BAL-rated install

Non-combustible Colorbond laid, ember guards fitted to all vents and openings, flashings sealed.

04

Handover

Compliance documentation issued for the insurer. Warranty documents in writing.

The numbers

190 m² Roof area
6 days Time on site
BAL-29 AS 3959 compliant
Insurer-ready Documentation

← Back to all projects

★★★★★

«My insurer asked for paperwork. They produced it. That alone was worth the call.»

Tony B., Mount Barker · verified project
Free roof check

Get a fixed price for your roof

Enter your phone. We'll call with the next step. No obligation.

$0 call-out · Fixed quote in 48h · No spam, ever

Thanks. We'll call you within 1 business hour.
☎ Call Now Free Roof Check